← Maintenance & DIY
Community work recordR129 SL

1997 Mercedes R129 SL restoration and chassis refurbishment

Pete1978 shares a year of work on a rusty parts car, including engine-bay, interior and front-chassis work, while several major jobs were still planned.

Edited by Future Classic ·
Topics in the accountRestoration
Mentioned in repliesRust treatment

Select a photo to view its source post. The source may require sign-in.

A parts car becomes a restoration project

Pete1978 initially bought the rusty 1997 M119 car for parts, describing the soft top as its only item in nearly new condition. A few months later he decided to restore the car. After about a year, he listed work on the interior, hydraulic system, water pump, pulleys, radiator, vacuum hoses, ignition coils and spark plugs. His wording groups replacement, refurbishment and cleaning together; it does not give a separate procedure or confirmed replacement status for every item.

The parts car at the start of the project.
The parts car at the start of the project.
Engine bay before the later work.
Engine bay before the later work.
A second engine-bay view in the original sequence.
A second engine-bay view in the original sequence.
Engine work shown in the opening post.
Engine work shown in the opening post.

Engine-bay and stripped-body work

In his next post, Pete1978 showed a broken component he called “CPS,” followed by water-pump and pulley work, a stripped interior and the original rear brake area. He said the broken CPS had nearly made him give up. The brief account does not explain how it broke, the removal method or a verified diagnostic result.

The broken component the author calls CPS.
The broken component the author calls CPS.
Water-pump and pulley work.
Water-pump and pulley work.
The stripped interior.
The stripped interior.
The original rear brake area.
The original rear brake area.

Rust treatment and front suspension parts

The next photo sequence shows removed front suspension components, an underside after treatment and a collection of new suspension and brake parts. Pete1978 described sanding and cleaning for several hours, applying rust converter and then paint. He listed 330 mm front brakes, Akebono pads, new lines and H&R sport springs. These are the parts and work reported for his project; the thread does not document a final road test, alignment or long-term result.

Removed front suspension components.
Removed front suspension components.
The underside after the author’s cleaning and treatment.
The underside after the author’s cleaning and treatment.
Suspension and brake parts shown in the final work post.
Suspension and brake parts shown in the final work post.

Work still on the list

At the time of the opening post, Pete1978 said rear suspension work, a new rear differential, a Quaife limited-slip differential, paint and wheels were still to come. His later reply said he was not planning to sell the car and would add more pictures. The thread ends without documenting completion of those planned jobs.

Based on the source author’s work record.

Discussion & reactions

Open discussion